عبود أ. . and عبد السلام زيدان (2024) “Integration between Earned Value Method and risk analysis to monitor and track the risks of construction projects”, Tishreen University Journal -Engineering Sciences Series,, 46(3), pp. 321–340. Available at: https://journal.tishreen.edu.sy/index.php/engscnc/article/view/17281 (Accessed: 13August2024).